Coastal Road
Mumbai Coastal Road Project 2024- Opening date, cost, benefits, routes and more
Coastal Road formally known as Chhatrapati Sambhaji Maharaj Coastal Motorway, is a grade separated highway with eight lanes and a length of 29.2 km. It is currently under construction and will connect Kandivali in the north to Marine Lines in the south along Mumbai's western shore. The estimated daily usage of 130,000 vehicles is anticipated to result in a 2-hour reduction in travel time between South Mumbai and the Western Suburbs to just 40 minutes. ₹13,060 crore, or US$1.6 billion, is the project's anticipated cost.