Exploring Mumbai Metro Line 3: Route Map, Stations, and Opening Status

Exploring Mumbai Metro Line 3: Route Map, Stations, and Opening Status

Mumbai, often regarded as the financial heartbeat of India, is on the brink of a significant transformation in its public transportation landscape with the introduction of Mumbai Metro Line 3, commonly referred to as the Aqua Line. The underground metro services will commence at 6:30 am and continue until 11:00 pm, providing trains every few minutes. Trains will run at speeds of up to 90 km per hour. This groundbreaking project, spearheaded by the Mumbai Metro Rail Corporation Limited (MMRCL), marks a pivotal moment as it will be the city’s first fully underground metro rail network, stretching an impressive 33.5 kilometers.

The Aqua Line is designed to enhance connectivity across some of Mumbai's most vital commercial hubs, including Colaba, Bandra-Kurla Complex (BKC), and SEEPZ. With 27 stations planned—26 of which will be underground and one at grade—this metro line is set to revolutionize the way residents and visitors navigate the city.

Current Status of Mumbai Metro Line 3

The Mumbai Metro Line 3 is expected to be operational in phases, with the first phase connecting Aarey Colony to Bandra Kurla Complex (BKC) scheduled to open by the end of April 2026. The second phase, running from BKC to Cuffe Parade, is slated for completion in October 2024.

Essential Information about Mumbai Metro Line 3

  • Total Length: 33.5 km
  • Number of Stations: 27
  • Metro Type: Rapid Transit Metro System
  • Funding: Loan from Japan International Cooperation Agency (JICA), equity contribution from the central and state governments, and other subordinate debt
  • Project Cost: Rs 33,405 Crore
  • Construction Type: Underground and at grade
  • Operator: Mumbai Metro Rail Corporation Limited (MMRCL)

Route Map for Mumbai Metro Line 3

The Mumbai Metro Line 3 will run along the Colaba-Bandra-SEEPZ corridor, connecting key financial hubs such as Nariman Point, BKC, Fort, Worli, Lower Parel, and Goregaon. The line will also provide connectivity to the airport, Cuffe Parade, Kalbadevi, Worli, BKC, Airport, SEEPZ, and MIDC.

Stations list of Mumbai Metro Line 3

The Mumbai Metro Line 3 will have 27 stations, with 26 being underground and one at grade. The stations are as follows:

◈ Aarey Colony
◈ SEEPZ
◈ MIDC
◈ Domestic Airport
◈ CSMIA T2
◈ Sahar Road
◈ CSMIA T1
◈ Santacruz
◈ Vidyanagri
◈ BKC (Bandra Kurla Complex)
◈ Dharavi
◈ Shitladevi Temple
◈ Siddhivinayak Temple
◈ Worli
◈ Acharya Atrey Chowk
◈ Science Museum
◈ Mahalaxmi
◈ Mumbai Central
◈ Grant Road
◈ Kalbadevi
◈ Chhatrapati Shivaji Maharaj Terminus
◈ Hutatma Chowk
◈ Churchgate
◈ Cuffe Parade

Interchange Stations Along the Aqua Line

The Mumbai Metro Line 3 will have multiple interchange stations, allowing commuters to easily transfer between different modes of transportation. These stations include:

  • Chhatrapati Shivaji Maharaj Terminus (CSMT): Interchange with Mumbai Local Trains
  • Churchgate: Interchange with Mumbai Local Trains
  • Mumbai Central: Interchange with Mumbai Local Trains
  • BKC: Interchange with Mumbai Metro Line 2A and 2B

Ticket Fare Structure for Mumbai Metro Line 3

The Mumbai Metro Line 3 will have a smart card-based ticketing system, similar to the one used in the Delhi Metro. Commuters will be able to purchase single journey tickets, stored value cards, and passes for convenient travel.

Potential Extensions of Mumbai Metro Line 3

The original plan for the Mumbai Metro Line 3 was to terminate at Cuffe Parade. However, the state government is currently exploring the possibility of extending the line to Navy Nagar.

Infrastructure Developments for Mumbai Metro Line 3

The Mumbai Metro Line 3 will feature state-of-the-art infrastructure, including:

  • Underground tunnels constructed using advanced Tunnel Boring Machines (TBMs)
  • Elevated and at-grade sections for seamless connectivity
  • Automatic Fare Collection (AFC) system
  • The depot at Aarey Colony for maintenance and storage of trains

Unique Features of Mumbai Metro Line 3

  • Expected to reduce traffic congestion by nearly 15%
  • Connectivity to key business districts and landmarks
  • Integration with existing suburban rail network
  • Improved accessibility and reduced travel times

Influence of Mumbai Metro Line 3 on Real Estate Trends

The Mumbai Metro Line 3 (Underground Metro 3) is expected to have a positive impact on the city's real estate market, particularly in areas along the corridor. The improved connectivity and accessibility are likely to attract more investments and lead to the development of new residential and commercial projects.

Yatri App: Your Ultimate Mumbai Local Companion

The Yatri app is an indispensable tool for navigating the city's extensive public transport system. As the official app of Mumbai Railways, Yatri offers real-time updates on local train schedules, metro timings, and bus routes, ensuring you stay informed and on time. With features like live train tracking and station information, Yatri makes your daily commute easier and more efficient. Whether you're planning your journey or tracking delays, the Yatri app is your go-to resource for all things related to Mumbai's local transport. Download the Yatri app today and experience seamless travel in the bustling city of Mumbai!

Conclusion: The Future of Mumbai Metro Line 3

The Mumbai Metro Line 3 is a game-changer for Mumbai's public transportation system. With its extensive route map, strategic station locations, and advanced features, the Aqua Line promises to revolutionize the way people commute in the city. As the project progresses towards completion, It would not only alleviate traffic congestion, but will also help Mumbai's general development and expansion.

Dated August 9, 2024